GEOGRAPHY of the company

Russia:

  • Volgograd
  • Novorossiysk
  • Syzran
  • Perm
  • Haryaga
  • Kogalym
  • Nizhnevartovsk
  • Pokachi
  • Uraj
  • Langepas
  • Yuzhnoye Shapkino
  • Vysotsk
  • Novy Urengoy
  • Yuzhno-Sakhalinsk
  • Budyonnovsk
  • Varandey
  • Yuzhnoye Hylchuyu

Armenia:

  • Yerevan

Uzbekistan:

  • Fergana

Таджикистан:

  • Yavan

Turkmenistan:

  • Mary
  • Chardzhou
  • Neftezavodsk
  • Turkmen-Bashi

Turkey:

  • Izmir

Performance of all complex of installation and construction works for the oil-extracting, oil-processing and gas industry.

Implementation of functions of the general contractor

Подробнее

Installation of a metalwork

Подробнее

Installation of tanks

Подробнее

The main process - welding

Подробнее

Installation of technological and main pipelines

Подробнее

Installation of processing equipment and constructions

Подробнее

Implementation of functions of the general contractor

• The organization of all types of works on construction of the facility within the approved project documentation and performance of all complex of works by own efforts and the attracted contract companies;
• Drawing up, and also control over the implementation of the schedule of construction;
• Development of an optimum funding plan of construction of the facility;
• Coordination of works of subcontractors;
• Control of observance of the production technology of works on an object;
• Organization of supply of building with necessary materials, machinery and equipment;
• Observance of safety measures on an object;
• Rational use of the territory of an object;
• Environmental protection;
• Transfer of an object of the operating organization for further operation in accordance with the established procedure;
• Commissioning of the object of construction of working inspection.

Implementation of functions of the general contractor
Implementation of functions of the general contractor
Implementation of functions of the general contractor

Installation of a metalwork

All metalwork mounted at us undergoes careful testing of services of technical control at different stages. The high quality confirmed with a guarantee and adequate cost of a metalwork favourably distinguishes us from other producers. Installation of a metalwork is labor-intensive process because a technological metalwork usually individual. This circumstance causes complexity of typification of methods of installation of a metalwork. Our professionalism and possibilities of production guarantee satisfaction of any customer in production and installation of a metalwork of various character.

Installation of a metalwork
Installation of a metalwork
Installation of a metalwork
Installation of a metalwork
Installation of a metalwork
Installation of a metalwork
Installation of a metalwork
Installation of a metalwork

Installation of tanks

Installation is made by highly qualified specialists with use of load-lifting cranes and special assembly devices. Welding of sheets of metal or elements the rulonirovannykh of panels is made by the mechanized semi-automatic welding in the environment of protective gases or (at installation of a wall of the tank) automatic welding under a gumboil layer. Welded connections undergo obligatory control by nondestructive methods (radiography, ultrasonic control, color defectoscopy and so forth).

Installation of tanks
Installation of tanks
Installation of tanks
Installation of tanks
Installation of tanks
Installation of tanks
Installation of tanks

The main process - welding

Our industrial complex is completely certified on carrying out welded works on production base and the building site. Also we make complete control of welded connections. For performance of work there are all necessary licenses, certificates and certificates in the field of nondestructive control of objects subordinated to Rostekhnadzor. Specialists of PEOPLE'S COMMISSARIAT FOR FOREIGN AFFAIRS laboratory are certified according to the Russian standards, and have long-term experience in the sphere of nondestructive control and diagnostics. High professionalism of our experts allows not only to reveal defects in welded connections and the main metal, but also to define the reason of their emergence.
The laboratory of nondestructive control and diagnostics is completed with all necessary modern equipment necessary for bystry and high-quality performance of work on nondestructive control.

The main process - welding
The main process - welding
The main process - welding
The main process - welding
The main process - welding
The main process - welding
The main process - welding

Installation of technological and main pipelines

Installation of pipelines is carried out according to the project, detail drawings (KTD), the project of works (PW) and safety regulations. Installation of pipelines is made in mainly ready knots made in the trubozagotovitelnykh shops complete with fittings, and also collected on the place of installation by blocks of pipelines with the maximum mechanization of installation works.

Installation of technological and main pipelines
Installation of technological and main pipelines
Installation of technological and main pipelines

Installation of processing equipment and constructions

All works on installation of processing equipment are performed according to modern international standards, sanitary and operational standards. Special attention is paid to observance of rules and requirements of safety measures. Also it is installed according to the coordinated project documentation, the operating specifications, standards, construction norms and rules of production and acceptance of work certified by experts in modern technologies with use of modern tools and materials.

Installation of processing equipment and constructions
Installation of processing equipment and constructions
Installation of processing equipment and constructions
Installation of processing equipment and constructions
Installation of processing equipment and constructions
Installation of processing equipment and constructions

READY PROJECTS All projects

III turn of development of the Haryaginsky oil field. Package 4. Modernization of the central production constructions Construction of MLSP Prirazlomnaya Building of installation of hydrocracking at a complex of the oil and petrochemical refineries in Nizhnekamsk Construction of a start-up complex of the plant of deep oil refining on an object of LLC KINEF Building of installation of preparation of oil with desulphurization of oil and gas on the Bayandynsky oil field The top structure of the Central Technological Platform (CTP) on the field of V. Filanovsky
Project:
III turn of development of the Haryaginsky oil field. Package 4. Modernization of the central production constructions
Customer:
Total E & P Russie
Carried-out works:
installation and construction work
Period:
Start – 2012 г. / Finish – 2015 г.
Project:
Construction of MLSP Prirazlomnaya
Customer:
LLC Sevmorneftegaz
Carried-out works:
Mechanical assembly works
Period:
Start – 2009 г. / Finish – 2012 г.
Project:
Building of installation of hydrocracking at a complex of the oil and petrochemical refineries in Nizhnekamsk
Customer:
JSC TANEKO
Carried-out works:
Building and construction works
Period:
Start – 2011 г. / Finish – 2014 г.
Project:
Construction of a start-up complex of the plant of deep oil refining on an object of LLC KINEF
Customer:
LLC Kirishinefteorgsintez
Carried-out works:
installation and construction work
Period:
Start – 2010 г. / Finish – 2013 г.
Project:
Building of installation of preparation of oil with desulphurization of oil and gas on the Bayandynsky oil field
Customer:
LLC LUKOIL-Komi
Carried-out works:
installation and construction work
Period:
Start – 2011 г. / Finish – 2015 г.
Project:
The top structure of the Central Technological Platform (CTP) on the field of V. Filanovsky
Customer:
LLC LUKOIL-Nizhnevolzhskneft
Carried-out works:
installation and construction work
Period:
Start – 2012 г. / Finish – 2017 г.
1 2 3 4 5 6